- Rewiring outlets and installing GFCI receptacles
- Gardening (mulch, weeding)
- Installing a new house number
- Stripping a door (will stain and varnish when the air is dryer)
- Ripping out carpet from basement steps and attic steps
- Repairing a broken air conditioner (unclogging drain pipe)
- Repairing water damage (drywall work and painting)
- Repainting the spare bedroom ( did the ceiling today- 2 coats, I hope to do the walls tomorrow with a Ralph Lauren faux painting in a canvas style) This included removing the trim from around the windows - the trim was yucky
I plan on ripping out the carpet in the basement and attic, but that may wait until the winter. The attic has hardwood that can be finished. I am thinking of putting a "spreadstone" surface in the basement over the concrete sub floor.

1 comment:
I'm tired just reading your post! You've been a busy girl!
Post a Comment